...
Interchange with the CNR – The Model Railway Show

Interchange with the CNR – The Model Railway Show

I mentioned how I had to break the link between indicators scenes to fit the real railway in my most recent post on building additional benchwork for my S- of the Niagara St Catherine and Toronto Railway. Through a series of letters, I thought I’d share some of my design choices.

I’ve previously gone over the Geneva Saint Terminal and the Port Dilosie Sub Division. Our next stop is the CNR interchange.

Beyond the Alps

The first item of business is to collect the central data from the terminal and the Asper Line operating in Ontario Avenue since the NS & T is ahead of Geneva. To do this, I used a simple intersection located to the terminal’s left.

nst tour 2025 03 20
The NS & T17 has two gondols when it first entered the switches within the Woodoff siding. Within the background, the NS&T 21 heads are about to cross Geneva Avenue when it results in the terminal. Each traces are at completely different heights, so the Ontario Avenue will get as much as meet the principle observe.

From right here, the road south heads in direction of Niagara Ecquiser – and a trade with CNR.


Which courtyard?

I wished so as to add a staging yard to this structure – a supply of all site visitors. I additionally wished to inform the sequence that the NS&T and its core firm, the Nationwide Railway of Canada, have a relationship. Right here, I needed to decide in favor of partaking actions.

In a perfect world, I’ll create an interchange yard model within the Morton (South Central Catheres). But it surely was an enormous place and I simply don’t have a spot in my structure room to dedicate this measurement yard. I may lower it, however the courtyard of the courtyard and the bodily relationship of the NS&T and CNR didn’t match within the type of my place.

nst tour 2025 03 24
A CNR prepare works in 1958. The NS & T is swing north to the precise.

Luckily, Mirton was not simply exchanging NS&T freight. An alternate is in Thorold, the place the 2 met NS & TCNR after climbing Niagara Scores. It was a easy matter – primarily NS & T fed at one finish and on the opposite by CNR.

nst tour 2025 03 26 labelled
Trying south with the Welland Canal in Thorold. Many of the observe on this photograph is CNR. The arrow factors to 2 tracks that type an interchange yard with NS & T.

That is very cheap for my place, so I made a decision to mix some components of Miton and Thorold in my yard.


NS & T Highline

In Mirton, the NS & T transfer on the north, whereas the CNR moved to the east and west. NS & T crossed CNR on a bridge that may be a signature scene:

nst tour 2025 03 25
The NS & T -Major Line crosses the CNR on this photograph.

I made a decision that this state of affairs is a modeling alternative that’s nice to go and – similar to the prototype – the bridge permits my NS & T to go by way of the CNR. So I’ve included the illustration of this scene within the order.

nst tour 2025 03 21
Freight Motor 20 head out of the body. Out of the body on the precise. A inexperienced and gold RS18 cnr mainline. The observe on the left will join the NS & T -Man with the Interchange Yard.

That is precisely, however it solves the issue and can create some fascinating concepts about structure.

nst tour 2025 03 23
The opposite aspect of the benchwork. Geneva Avenue and Woodoff are on the left, whereas Ontario Avenue may be seen alongside the wall.

I wished to recommend that regardless of the peak distinction, each traces are literally out there. So the CNR NS & T is shortly climbed as a substitute of cleansing the tower.

Because the CNR observe is absolutely beauty, I’m not bothered to pose grade by way of working challenges. In my thoughts, it suggests to climb Niagara Essement – which is believed to be the quickest most important line grade of CNR. On the similar time, an pleasure swings from the principle observe of the NS & T and descends from a light-weight grade to finish within the yard.


A supply of site visitors

I selected a courtyard with three tracks – two, equivalent to in Thorold, in addition to the third on which I’ll discover a observe scale. Mirton had a scale (as was the thourded at one time), and would come with an additional step of a few of the burden that went out.

nst tour 2025 03 22
The three observe interchange yard can place 15 50 toes automobiles on two tracks, and it additionally features a scale observe for extra operational curiosity. The junction between Geneva Avenue and the principle observe of Ontario Avenue is throughout the junction.

I noticed that if I design the yard to be lively (equivalent to may be restored through the session), it may trigger extra site visitors within the decrease area. It really works effectively as a result of I’ve two or six drivers cupboards to roll up inventory storage immediately from this yard, so I can simply transfer the products on the structure and out.


I’ve coated all of the settings I’ve designed and made to today. Time to begin building of turnout and calf observe!

Skip to toolbar