Geneva Street Terminal – The Model Railway Show

Geneva Street Terminal – The Model Railway Show

In a earlier put up about creating extra benchwork for my S – of Niagara St. Catherine and Toronto Railway, I discussed that I needed to awaken the connection between signed scenes to suit the true railway. I believed I might share a few of my design selections by means of a collection of letters.


nst tour 2025 03 17
Photoshot from the southwestern nook of Geneva Avenue and the Welland Avenue is seen within the northeast. The monitor by means of the bushes is a scene I intend to seize my sequence.
nst tour 2025 03 16
A colourful postcard of the terminal.

This can be a nice view of the Central Terminal constructing for Niagara St. Catherine and Toronto Railway. It reveals the design of the constructing fairly effectively.

nst tour 2025 03 18
An aerial picture of the terminal that displays the latter and a variety of routes that undergo.

The terminal was designed to regulate the trains on a number of subdivisions, in addition to the Niagara Falls and the primary line trains to go. Metropolis automobiles present hyperlinks to the town from the west.

Nonetheless, the middle of transport was by no means used as a goal. Only a few runs have been began or ended right here and the weld division trains by no means used it. Within the later years, the platform tracks within the photographs are generally occupied by the care of the products.

nst tour 2025 03 19
Specific motor 41 checked out one of many three stub tracks on the east of the terminal.

Once I lived within the St. Catharise, the Terminal had a financial institution and a enterprise college within the Montreal Department. Within the Nineties (I consider) was demolished to pave the way in which for a strip items.

Nonetheless, regardless of by no means seeing the terminal when it’s in use, I’ve a number of the wonderful photographs which might be in my assortment and plenty of different individuals have been printed in books in regards to the railway. So that is undoubtedly a signature scene.

From a structure operation perspective, I like it is a assembly house for a number of traces.


My structure is a wierd, triangle-shaped corner-best for the transmission. It’s situated on the left aspect of the Ontario Avenue Sen and behind the Woodoff Siding scene described within the earlier put up. I stored the Geneva Avenue scene an inch greater than the Woodoff siding: This can be a small variation, however sufficient to separate them.

I didn't have room for all six tracks – 1:64 the benchworks deepened – however I used to be in a position so as to add many vital options. These embody three stub tracks, siding in bushes on the north aspect of the welland avenue, and Grantham's most port dlosses East.

nst tour 2025 03 10
My model of the terminal is drawn in crimson. All three stub tracks run between an umbrella platform. Turnout on the correct are on the ground of the welland Avenue.
nst tour 2025 03 09
The prepare in opposition to the wall is on a slim staging shelf that represents the Granth Sub Division. The open house between the terminal and this staging monitor offers entry to this deep scene. I’ll disrupt the bushes.
nst tour 2025 03 08
nst tour 2025 03 04
One other take a look at Woodoff siding from the earlier put up. The scene of Geneva Avenue is one inch excessive, on the left, and rotates across the partitions to the correct in two staging tracks hidden by the Mac Canon constructing on Ontario Avenue.

I’ll proceed the tour sooner or later put up.

Skip to toolbar