...
Geneva Street Terminal – The Model Railway Show

Geneva Street Terminal – The Model Railway Show

Earlier in this post, I mentioned that I wanted to awaken the link between signed scenes to make my S-Scale model of the Niagara St. Catherine and Toronto Railway more accurate. I thought I may send a series of letters outlining some of my design choices.

Woodoff Siding, Ontario Avenue, and the NS & T automotive warehouses were among the signed scenes linked to the Port Daloozi Sub Division that I detailed in the first post. The NS&T terminal in St. Louis’s Geneva Avenue will be modeled in the following manner.


nst tour 2025 03 17
Photoshot from the southwestern nook of Geneva Avenue and the Welland Avenue is seen within the northeast. The monitor by means of the bushes is a scene I intend to seize my sequence.
nst tour 2025 03 16
A colourful postcard of the terminal.

The Niagara, St. Catherine, and Toronto Railway’s Central Terminal is now under construction, and this is a beautiful view of it. The ‘s design is fairly well shown by it.

Located west of a triangular site on Geneva Avenue, he was built by CNR in 1923 and opened to the public in 1924. On one level was the NS&T headquarters, while on the other was the ticket office and the ready room. The terminal area was formed by three short tracks that came into the lot from the right side, running east, and three lines that passed through the north side of the Bilfour Avenue parallel building.

nst tour 2025 03 18
An aerial picture of the terminal that displays the latter and a variety of routes that undergo.

The main line trains, as well as those from the Niagara Falls and other subdivisions, could all be controlled from the terminal. Urban vehicles serve as western access points to the city.

However, the transportation hub was never intended to serve as a target. There have been very few starts and ends here, and the weld division trains never even used it. The care of the merchandise typically occupies the platform tracks within the images in the latter years.

nst tour 2025 03 19
Specific motor 41 checked out one of many three stub tracks on the east of the terminal.

Once I lived within the St. Catharise, the Terminal had a financial institution and a enterprise college within the Montreal Department. Within the Nineties (I consider) was demolished to pave the way in which for a strip items.

Nonetheless, regardless of by no means seeing the terminal when it’s in use, I’ve a number of the wonderful photographs which might be in my assortment and plenty of different individuals have been printed in books in regards to the railway. So that is undoubtedly a signature scene.

From a structure operation perspective, I like it is a assembly house for a number of traces.


My structure is a wierd, triangle-shaped corner-best for the transmission. It’s situated on the left aspect of the Ontario Avenue Sen and behind the Woodoff Siding scene described within the earlier put up. I stored the Geneva Avenue scene an inch greater than the Woodoff siding: This can be a small variation, however sufficient to separate them.

I didn’t have room for all six tracks – 1:64 the benchworks deepened – however I used to be in a position so as to add many vital options. These embody three stub tracks, siding in bushes on the north aspect of the welland avenue, and Grantham’s most port dlosses East.

nst tour 2025 03 10
My model of the terminal is drawn in crimson. All three stub tracks run between an umbrella platform. Turnout on the correct are on the ground of the welland Avenue.
nst tour 2025 03 09
The prepare in opposition to the wall is on a slim staging shelf that represents the Granth Sub Division. The open house between the terminal and this staging monitor entry to this deep scene. I’ll disrupt the bushes.
nst tour 2025 03 08
This view of Ontario Avenue – which is included within the earlier put up, reveals two trains on tracks in opposition to the wall. They are going to be hidden within the Mac Canon constructing. The monitor will conduct a switch run from the NS & T-CNR Interchange Yard within the close by monitor. The earlier monitor represents the Lakshwar Sub Division to Port Waler. Each are consuming within the Geneva Avenue scene across the nook on the left.
nst tour 2025 03 04
One other take a look at Woodoff siding from the earlier put up. The scene of Geneva Avenue is one inch excessive, on the left, and rotates across the partitions to the correct in two staging tracks hidden by the Mac Canon constructing on Ontario Avenue.

I’ll proceed the tour sooner or later put up.

Skip to toolbar